After Eight Months, NRC Resumes Operations At Abuja-Kaduna Railway
Written by City Radio on December 5, 2022
The Nigerian Railway Corporation (NRC) has resumed operations at the Kaduna-Abuja railway, eight months after they were suspended.
In March, Boko Haram attacked a passenger train along the route, leading to deaths, abduction, and injuries to the passengers. The NRC in the wake of the attack suspended the service with the abducted persons released piecemeal.
But on Monday, operations resumed with the first train leaving the Rigasa Train Station in Kaduna to Abuja by 8:00 am. The first train also departed the Idu Train Station in Abuja to Kaduna State by 9:45 am. The Kaduna-Abuja bound train arrived at the Idu Train Station exactly at 10:22 am.
There was a low turnout of passengers which was owing largely to the short resumption notice while security presence was high.
Log in On March 12, 2023 at 8:14 am
Cool. I spent a long time looking for relevant content and found that your article gave me new ideas, which is very helpful for my research. I think my thesis can be completed more smoothly. Thank you.