FG reels out new policies on road infrastructure…
Written by City Radio on November 24, 2023
The minister of work, Dave Umahi, has reiterated the importance of the emphasis attached to quality delivery of construction works by the administration of President Bola Tinubu.
He said that the ‘business as usual’ syndrome in road construction is no longer tenable under the Renewed Hope administration.
Umahi added that the federal government under President Tinubu is committed to outstanding quality, value for money, innovation, responsiveness, fast deliveries, and technical expertise in road infrastructure development in the country.
He stressed that it has become expedient to disabuse the minds of the contractors handling government road projects from executing the jobs in contradiction of set standards.
In a statement by his chief press secretary, Uchenna Orji, while receiving a delegation of the Nigerian Society of Engineers (NSE), led by the President, Tasiu Gidari Wudil in his office on Thursday, November 23, Umahi reeled out the new policies to guide road infrastructure in the country.
The new policies include good stabilized and tested subgrade and sub-base course before pavement placement; expose subgrade, sub-base; and base course to 60 days of vehicular movement and continuous sheep-foot rolling before pavement placement.
Others are the introduction of reinforced concrete road pavement in most road carriageways and shoulders; continuous maintenance of all roads under construction throughout the life of the project under contract; effective design of road infrastructure anchored on a detailed report of environmental site conditions and geotechnical report; and community relations in terms of keeping roads motorable under the period of the contract.
The minister however emphasised that supervision was necessary in the actualization of quality delivery of road construction whether concrete pavement or asphalt, noting that each of the two models has its own attendant conditions.